Next stage of the dismantling process4924 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
|
|

Second lot of parts arrive at museum4579 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum6061 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4355 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum6664 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4884 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4187 viewsThese arrived at museum 11 October 2006
|
|

Next stage of the dismantling process4688 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
|
|

Engineers at college6187 viewsThe engineers at the college when the engine was installed in Oct 1967.
Photograph courtesy of Maurice Clyde
|
|

Crank being fitted5997 viewsWhen the engine was installed at the Marine College in Oct 1967, crank being fitted.
Photograph courtesy of MauriceClyde
|
|

First load of Doxford engine parts arrive at museum4877 viewsPhotograph taken by Geoff Challinor of first load of parts arriving 3 October 2006. Load consists of the top section of the scavenge pump, top piston and cross head assembly and various smaller parts.
|
|

The next load arrives on a glorious sunny day4470 viewsCrank shaft and water brake - each weighing 17 tons
|
|