Next stage of the dismantling process4921 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
|
|

Second lot of parts arrive at museum4578 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum6059 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4354 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum6664 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4883 viewsThese arrived at museum 11 October 2006
|
|

Second lot of parts arrive at museum4185 viewsThese arrived at museum 11 October 2006
|
|

Next stage of the dismantling process4684 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
|
|

Engineers at college6186 viewsThe engineers at the college when the engine was installed in Oct 1967.
Photograph courtesy of Maurice Clyde
|
|

Crank being fitted5995 viewsWhen the engine was installed at the Marine College in Oct 1967, crank being fitted.
Photograph courtesy of MauriceClyde
|
|

First load of Doxford engine parts arrive at museum4876 viewsPhotograph taken by Geoff Challinor of first load of parts arriving 3 October 2006. Load consists of the top section of the scavenge pump, top piston and cross head assembly and various smaller parts.
|
|

The next load arrives on a glorious sunny day4468 viewsCrank shaft and water brake - each weighing 17 tons
|
|