Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Archive photos of engines and museum views
>
Construction Work up to 2007
Most viewed - Construction Work up to 2007
getting to grips with the Campbell
2193 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees being removed to widen the driveway
2109 views
Trees down the drive need to be taken down to widen the area
2101 views
prior to the move
2101 views
the engine had to be dismantled in the car park prior to its move to a new location
More stone ready for flattening
1991 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Preparing the foundations
1980 views
Work on widening the drive and entrance area before new surface laid
1809 views
Another delivery of concrete for the floors arrives
1747 views
More stone waiting to be laid
1745 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Campbell Engine being reassembled outside museum entrance
1743 views
The flywheel being lowered into place.
crank case being lifted off
1741 views
the engine had to be dismantled in the car park prior to its move to a new location
Mirrlees engine needs to be moved to allow access to the Campbell
1730 views
105 files on 9 page(s)
1
2
3
4
5
6
7
8
9